- Wake context indicates FRE-589 is active (high priority)
- Tauri framework setup exists from FRE-606
- Packaging for macOS, Windows, Linux pending
- Native menu bars, system tray, and file integration pending
Next: Verify if FRE-589 work is in progress or needs to be started
- Updated router.ts middleware for Clerk authentication
- Modified test contexts to use clerkUserId
- Added team tables to test schema
- Updated WaitlistForm and waitlist page
- Created src/server/trpc/ parallel structure
All 258 tests pass. Ready for Security Reviewer.
- Register service worker for offline caching (app shell + API responses)
- Link manifest.json in index.html with updated theme colors
- Update manifest start_url to /app/dashboard for PWA experience
- Add comprehensive team management CSS with responsive breakpoints
- Add alert, loading, and danger button styles
- Mobile-first responsive layout for team list and detail views
- Replace mock data with tRPC API calls for team CRUD operations
- Add TeamList view with fetch, create, and delete teams
- Add TeamDetail view with member management (list, invite, update role, remove, leave)
- Use solid-js <For> for proper keyed list rendering
- Add loading/error states and confirmation dialogs
- Use @tanstack/react-query for data fetching and cache invalidation
Create analytics-router.ts with ~30 tRPC endpoints for KPI management, alert
rules, scheduled reports, cohort analysis, and NPS survey integration.
Register router in index.ts under 'analytics' namespace. Fix pre-existing
bugs in service files: snake_case to camelCase conversion, missing non-null
assertions, and incorrect DB access patterns.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
Completed review of CTO silent run detection.
Finding: False positive - CTO process (PID 1017156) is healthy and running.
- Run 22d252ed silent for ~1h but CTO has no active assignments
- Silence is expected for idle/awaiting-work state
- Different from CMO pattern (CMO was quietly working on 4+ issues)
Action: Marked FRE-4455 as done, no intervention needed.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
- Cancelled 700+ runaway recovery issues (FRE-767 through FRE-2000+)
- Reassigned FRE-620 (analytics setup) from error-state Senior Engineer to available Founding Engineer
- Removed blocker chain that was preventing FRE-620 from progressing
- Documented system bug: recovery system creates recovery issues for cancelled recovery issues
Co-Authored-By: Paperclip <noreply@paperclip.ing>
- Fixed UTF-8 encoding issue that caused repeated run failures
- Assigned child issues (FRE-673, FRE-674) to CMO for execution
- All campaign assets ready (6 documents in /marketing/)
- CMO to execute mod outreach April 27-28
- Campaign launch scheduled for May 3
Co-Authored-By: Paperclip <noreply@paperclip.ing>