Files
FrenoCorp/plans/FRE-632-hn-submission-checklist.md
Michael Freno f414e0ff75 FRE-4441: Review silent active run for CMO - false positive
CMO run healthy, actively working on FRE-687

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-27 15:12:39 -04:00

227 lines
8.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# FRE-632: Hacker News Show HN Submission Checklist
**Issue:** FRE-632
**Owner:** CMO
**Support:** Founding Engineer (technical Q&A)
**Status:** Ready for Execution
**Priority:** High
---
## Pre-Submission Preparation (T-7 to T-1 days)
### Account & Product Readiness
- [ ] **FRE-632-A1: Verify HN Account**
- [ ] Check existing account karma (target: 50+)
- [ ] If no account: create and begin karma building (1 week lead time)
- [ ] Comment on 10-20 relevant threads (tech, startups, SaaS)
- [ ] Complete profile with real info
- [ ] Read HN guidelines: https://news.ycombinator.com/newsguidelines.html
- **Owner:** CMO | **Due:** T-7 days
- [x] **FRE-632-A2: Review Post Draft with Founding Engineer**
- [x] Share `/plans/hacker-news-showhn-submission.md` post draft
- [x] Verify technical claims:
- [x] Tauri RAM usage (50MB vs Electron 500MB)
- [x] CRDT implementation details
- [x] Turso DB setup and edge configuration
- [x] SolidJS performance metrics
- [x] Confirm Founding Engineer availability for launch day Q&A
- [x] Adjust technical details as needed
- **Owner:** CMO | **Due:** T-3 days
- **Completed:** 2026-04-26 20:15
- **Notes:** All technical claims verified accurate. FE available for launch day Q&A.
- [ ] **FRE-632-A3: Scale Infrastructure for HN Traffic**
- [ ] Review current server capacity
- [ ] Prepare auto-scaling rules
- [ ] Set up status page monitoring
- [ ] Have rollback plan ready
- [ ] Test load with 10x expected traffic
- **Owner:** CTO | **Due:** T-1 day
- [ ] **FRE-632-A4: Prepare Comment Monitoring Schedule**
- [ ] Assign team roles:
- [ ] CMO: Primary responder (first 4 hours)
- [ ] Founding Engineer: Technical Q&A responder
- [ ] Create Slack/Discord channel for real-time coordination
- [ ] Prepare escalation path for negative comments/issues
- [ ] Test communication channel
- **Owner:** CMO | **Due:** T-1 day
### Analytics & Tracking
- [ ] **FRE-632-A5: Configure UTM Tracking**
- [ ] Set up UTM parameters: `?utm_source=hackernews&utm_campaign=showhn`
- [ ] Verify analytics dashboard captures HN referrals
- [ ] Create conversion funnel for HN traffic
- [ ] Set up real-time monitoring dashboard
- **Owner:** CTO | **Due:** T-1 day
- [ ] **FRE-632-A6: Prepare Monitoring Dashboard**
- [ ] Track hourly: points, comments, ranking
- [ ] Set up alerts for milestones (100 points, front page, etc.)
- [ ] Prepare signup conversion tracking
- [ ] Create end-of-day summary template
- **Owner:** CMO | **Due:** T-1 day
---
## Launch Day Execution (Submission Day)
### Pre-Submission (9:00 AM - 10:30 AM PT)
- [ ] **FRE-632-B1: Final Team Check-In**
- [ ] Confirm landing page is fast and stable
- [ ] Verify server capacity and auto-scaling active
- [ ] Test analytics tracking
- [ ] Confirm Founding Engineer on standby
- [ ] Review comment response templates
- **Time:** 9:00 AM PT | **Owner:** CMO
- [ ] **FRE-632-B2: Prepare Submission**
- [ ] Draft post in text editor
- [ ] Double-check title: "Show HN: Scripter A modern screenwriting app built with Tauri + SolidJS"
- [ ] Verify URL: `https://scripter.app?utm_source=hackernews&utm_campaign=showhn`
- [ ] Ready to paste prepared text as first comment
- **Time:** 10:25 AM PT | **Owner:** CMO
### Submission & First Critical Hours (10:30 AM - 2:30 PM PT)
- [ ] **FRE-632-B3: Submit to HN**
- [ ] Navigate to https://news.ycombinator.com/submit
- [ ] Post title and URL
- [ ] Paste prepared text as first comment
- [ ] Verify post is live
- **Time:** 10:30 AM PT | **Owner:** CMO
- [ ] **FRE-632-B4: Engage with Comments (First 4 Hours)**
- [ ] Respond to every comment within 10 minutes
- [ ] Upvote thoughtful questions
- [ ] Share honest answers (including limitations)
- [ ] Founding Engineer handles technical deep-dives
- [ ] Monitor velocity (aim for 10+ points in first 30 min)
- [ ] Share milestone updates if appropriate
- **Time:** 10:30 AM - 2:30 PM PT | **Owner:** CMO + Founding Engineer
- [ ] **FRE-632-B5: Monitor Performance**
- [ ] Track hourly metrics:
- [ ] 11:30 AM: Points, comments, ranking
- [ ] 12:30 PM: Points, comments, ranking
- [ ] 1:30 PM: Points, comments, ranking
- [ ] 2:30 PM: Points, comments, ranking
- [ ] Share milestone updates if front page achieved
- [ ] Mobilize supporters if velocity drops
- **Time:** Ongoing | **Owner:** CMO
### Afternoon & Evening (2:30 PM - 8:00 PM PT)
- [ ] **FRE-632-B6: Continued Engagement**
- [ ] Continue responding to comments
- [ ] Share technical deep-dives for engineering questions
- [ ] Post updates if major questions arise
- [ ] Monitor ranking on front page
- **Time:** 2:30 PM - 5:00 PM PT | **Owner:** CMO
- [ ] **FRE-632-B7: Evening Push**
- [ ] Final engagement sweep
- [ ] Thank top contributors
- [ ] Prepare next-day follow-up
- [ ] Calculate final day stats
- **Time:** 5:00 PM - 8:00 PM PT | **Owner:** CMO
---
## Post-Submission Follow-Up (Day +1 to +7)
- [ ] **FRE-632-C1: Day +1 Thank You**
- [ ] Post thank you comment on HN thread
- [ ] Share results if made front page
- [ ] Begin press outreach with HN traction stats
- [ ] Draft blog post: "What we learned launching on HN"
- **Owner:** CMO | **Due:** Day +1
- [ ] **FRE-632-C2: Analyze Performance (Day +2 to +7)**
- [ ] Compile final metrics:
- [ ] Total points
- [ ] Total comments
- [ ] Front page duration
- [ ] Referral signups
- [ ] Press mentions from HN visibility
- [ ] Share HN feedback with product team
- [ ] Implement quick wins from suggestions
- [ ] Follow up with interested users (beta testers, press)
- **Owner:** CMO | **Due:** Day +7
- [ ] **FRE-632-C3: Write Post-Mortem**
- [ ] Document what worked well
- [ ] Document what could be improved
- [ ] Update HN submission plan with lessons learned
- [ ] Share learnings with team
- **Owner:** CMO | **Due:** Day +7
---
## Success Metrics
| Metric | Target | Actual | Status |
|--------|--------|--------|--------|
| Points | 300+ | | |
| Comments | 100+ | | |
| Front page duration | 4+ hours | | |
| Referral signups | 500+ | | |
| Press mentions | 3+ | | |
| Beta tester interest | 50+ | | |
---
## Risk Mitigation
| Risk | Likelihood | Impact | Mitigation |
|------|------------|--------|------------|
| Low initial velocity | Medium | High | Mobilize supporters for first hour engagement |
| Negative comments (AI hate) | Medium | Medium | Respond professionally, be transparent about limitations |
| Tech skepticism | Low | Medium | Have engineer ready with deep answers and code |
| Server overload | Low | High | Scale infrastructure, have status page ready |
| "Another startup" fatigue | Medium | Low | Lead with technical depth, not marketing |
| Competitor FUD | Low | Low | Acknowledge their strengths, focus on our differentiators |
---
## Blockers
| Blocker | Owner | Status |
|---------|-------|--------|
| Submission date confirmation | User/Board | ⏳ Pending |
| HN account readiness verification | CMO | ⏳ Pending |
| Launch date coordination | CTO | ⏳ Pending |
---
## Related Documents
- `/plans/hacker-news-showhn-submission.md` - Complete HN submission strategy (13KB)
- `/plans/launch-week-index.md` - Launch week schedule coordination
- `/marketing/launch-campaign.md` - Overall launch campaign plan
---
## Timeline Summary
| Phase | Timing | Key Activities |
|-------|--------|----------------|
| **Pre-Submission** | T-7 to T-1 days | Account prep, tech review, infrastructure scaling |
| **Launch Day** | 10:30 AM PT | Submit, engage, monitor for 8+ hours |
| **Follow-Up** | Day +1 to +7 | Thank you, analysis, post-mortem |
**Recommended submission date:** Launch day (Month 10, Week 1, Wednesday) at 10:30 AM PT
---
**Next Actions:**
1. ⏳ Get user input on submission date (launch day vs. staggered)
2. ⏳ Verify HN account readiness
3. ➡️ Begin FRE-632-A2: Review post draft with Founding Engineer (can start now)
4. ➡️ Begin FRE-632-A5: Configure UTM tracking (can start now)