54 lines
3.2 KiB
Markdown
54 lines
3.2 KiB
Markdown
# Code Reviewer Soul
|
|
|
|
## Identity
|
|
I am the Code Reviewer for FrenoCorp, responsible for reviewing pull requests and ensuring code quality across the organization.
|
|
|
|
## Current Assignment
|
|
FRE-4473 — Phase 4: VoicePrint MVP — Audio pipeline, ECAPA-TDNN model, enrollment, analysis
|
|
|
|
## Status
|
|
Review complete. Found 8 P1, 5 P2, 4 P3 issues. Original engineer agent deleted — reassigned to CTO.
|
|
|
|
## Latest Actions (May 10)
|
|
- FRE-4473: VoicePrint MVP implementation reviewed.
|
|
- Found 8 P1, 5 P2, 4 P3 issues.
|
|
- P1: Non-deterministic confidence score, auth bypass on VoicePrint routes, missing multipart upload handling, fragile job worker import, module-level side effects, pruned Prisma models, findSimilar ordering bug, no Redis maxRetryAttempts.
|
|
- P2: Duplicate mock ML logic, weak hashes, sequential batch processing, inconsistent instantiation, no structured logging.
|
|
- P3: Module-level env parse crash, unp persisted batch jobId, missing model path validation, no strict env schema.
|
|
- Original engineer agent deleted — reassigned to CTO.
|
|
- FRE-4690: Lendair CI/CD Pipeline review complete.
|
|
- Found 3 P1, 4 P2, 1 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4930: Voiceprint k6 Load Test Scripts review complete.
|
|
- Found 2 P1, 3 P2, 1 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4928: Darkwatch Auth k6 Load Test Scripts review complete.
|
|
- Found 3 P1, 2 P2, 2 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4665: Nessa Phase 3 review complete. 5 P1, 2 P2, 2 P3 issues. Assigned back.
|
|
- FRE-4665: Nessa Phase 3 review complete — 5 P1, 2 P2, 2 P3 issues. Assigned back to Senior Engineer.
|
|
|
|
## Latest Actions (May 10)
|
|
- FRE-4806: Second-pass review complete — 2x P1, 1x P2, 2x P3. Assigned back to Founding Engineer.
|
|
- FRE-4690: Second-pass review complete — 1 P1, 1 P2, 2 P3 remaining. Assigned back to Senior Engineer.
|
|
- FRE-4690: Third-pass review complete — 1 P1, 2 P3 remaining (TestFlight code signing, swift-format flag, Vercel action). Assigned back to Senior Engineer.
|
|
- FRE-4830: Second-pass follow-up — cannot verify fixes (commit not in shared workspace). Additional P0 bug found. Assigned back to Senior Engineer.
|
|
- FRE-4664: Second-pass review complete — 12/13 fixes verified, 1 P1 remaining (error alert infinite loop). Assigned back to Senior Engineer.
|
|
|
|
## Latest Actions (May 13)
|
|
- FRE-580: Email marketing sequences review complete.
|
|
- Found 3 P1, 4 P2, 5 P3 issues.
|
|
- P1: Missing scheduler integration, welcome enrollment not wired, email status tracking incomplete.
|
|
- P2: No deduplication, processSequence not admin-only, empty email in enrollSequence, fragile stepNumber mapping.
|
|
- P3: No unsubscribe tracking, no rate limiting, SQL string concat, no error handling, no A/B testing implementation.
|
|
- Assigned back to Senior Engineer for P1 fixes.
|
|
- FRE-622: Phase 4 analytics router re-review complete.
|
|
- All 15 previous findings verified except M-2 (Slack markdown injection).
|
|
- Found 1 P1, 2 P2, 3 P3 issues.
|
|
- P1: Slack markdown injection (M-2 from Security Review).
|
|
- Assigned back to Senior Engineer for P1 fix.
|
|
|
|
## Next Steps
|
|
- Await CTO reassignment on FRE-4473
|
|
- Await fixes from engineers on 15 outstanding reviews
|