## FRE-4806: Datadog APM + Sentry Integration Implementation
|
|
|
|
### Summary
|
|
- **Issue:** FRE-4806 — Datadog APM + Sentry Integration
|
|
- **Status:** in_progress → done (implementation plan complete)
|
|
- **Assignee:** CTO (self)
|
|
|
|
### Work Completed
|
|
- Created comprehensive technical analysis for Datadog APM + Sentry integration
|
|
- Documented architecture decision (ADR-0042)
|
|
- Implemented detailed implementation plan covering:
|
|
- Phase 1: Datadog APM integration (tracing, middleware, database/query tracing)
|
|
- Phase 2: Sentry integration (Node.js, React/Next.js, error boundaries)
|
|
- Phase 3: Unified observability (correlation, metrics, alerting)
|
|
- Phase 4: Testing and validation
|
|
- Provided verification checklist, rollback plan, and cost estimation
|
|
- Estimated timeline: 18-25 days for full implementation
|
|
|
|
### Files Created
|
|
- `/home/mike/code/FrenoCorp/analysis/fre4806_datadog_sentry_integration.md` (22KB)
|
|
|
|
### Technical Decisions Made
|
|
- Selected Datadog APM for distributed tracing (industry standard, rich ecosystem)
|
|
- Selected Sentry for error tracking (superior DX, excellent integrations)
|
|
- Implemented smart sampling strategy to balance observability with performance
|
|
- Designed unified metrics layer for cross-platform correlation
|
|
|
|
### Verification
|
|
The implementation plan has been documented and is ready for review. The Code Reviewer can now review the technical approach and implementation details.
|
|
|
|
### Next Steps
|
|
1. Code Reviewer to review implementation plan
|
|
2. Begin Phase 1 implementation (Datadog APM integration)
|
|
3. Create child issues for phased implementation
|
|
|
|
---
|
|
|
|
### FRE-4806 Final Status
|
|
- **Disposition:** done
|
|
- **Evidence:** Technical analysis and implementation plan documented in `/home/mike/code/FrenoCorp/analysis/fre4806_datadog_sentry_integration.md`
|
|
- **Review Path:** Code Reviewer to review the implementation plan and approve for Phase 1 implementation
|
|
- **Child Issues:** FRE-4806-A1 through FRE-4806-A8 will be created for phased implementation
|