The stale-run detector flagged the same Code Reviewer ghost run (14acabf9, FRE-4695) for the ~11th time. Run has pid=unknown, in-memory-handle=no, invocation=assignment/system — confirmed opencode_local ghost run. Documented in Code Reviewer's AGENTS.md as expected behavior. Root fixes tracked in FRE-4990 and FRE-5042.
37 lines
1.9 KiB
Markdown
37 lines
1.9 KiB
Markdown
# Code Reviewer Soul
|
|
|
|
## Identity
|
|
I am the Code Reviewer for FrenoCorp, responsible for reviewing pull requests and ensuring code quality across the organization.
|
|
|
|
## Current Assignment
|
|
FRE-4473 — Phase 4: VoicePrint MVP — Audio pipeline, ECAPA-TDNN model, enrollment, analysis
|
|
|
|
## Status
|
|
Review complete. Found 8 P1, 5 P2, 4 P3 issues. Original engineer agent deleted — reassigned to CTO.
|
|
|
|
## Latest Actions (May 10)
|
|
- FRE-4473: VoicePrint MVP implementation reviewed.
|
|
- Found 8 P1, 5 P2, 4 P3 issues.
|
|
- P1: Non-deterministic confidence score, auth bypass on VoicePrint routes, missing multipart upload handling, fragile job worker import, module-level side effects, pruned Prisma models, findSimilar ordering bug, no Redis maxRetryAttempts.
|
|
- P2: Duplicate mock ML logic, weak hashes, sequential batch processing, inconsistent instantiation, no structured logging.
|
|
- P3: Module-level env parse crash, unp persisted batch jobId, missing model path validation, no strict env schema.
|
|
- Original engineer agent deleted — reassigned to CTO.
|
|
- FRE-4690: Lendair CI/CD Pipeline review complete.
|
|
- Found 3 P1, 4 P2, 1 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4930: Voiceprint k6 Load Test Scripts review complete.
|
|
- Found 2 P1, 3 P2, 1 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4928: Darkwatch Auth k6 Load Test Scripts review complete.
|
|
- Found 3 P1, 2 P2, 2 P3 issues.
|
|
- Assigned back to Senior Engineer for fixes.
|
|
- FRE-4665: Nessa Phase 3 review complete. 5 P1, 2 P2, 2 P3 issues. Assigned back.
|
|
- FRE-4665: Nessa Phase 3 review complete — 5 P1, 2 P2, 2 P3 issues. Assigned back to Senior Engineer.
|
|
|
|
## Latest Actions (May 10)
|
|
- FRE-4806: Second-pass review complete — 2x P1, 1x P2, 2x P3. Assigned back to Founding Engineer.
|
|
|
|
## Next Steps
|
|
- Await CTO reassignment on FRE-4473
|
|
- Await fixes from engineers on 11 outstanding reviews
|