Files
FrenoCorp/plans/FRE-631-production-handoff.md
Michael Freno 67c3881dcf Add waitlist schema for marketing (FRE-635)
- Created waitlist_signups and waitlist_events tables
- Supports email, name, source tracking, and status management
- Enables VIP supporter list for Product Hunt launch
- Migration 0002_chemical_shocker.sql generated
- Fixed brand color in product-hunt-assets-brief.md (#518ac8)
2026-04-26 06:21:20 -04:00

173 lines
4.6 KiB
Markdown

# FRE-631 Production Handoff Brief
**Status:** Planning complete, ready for human execution
**Date:** 2026-04-26
**Parent Issue:** FRE-631
**Goal:** Scripter launch campaign
---
## What's Done (AI-Completed)
**Strategy & Planning**
- Campaign strategy document
- Channel breakdown (Twitter, Reddit, Discord, YouTube)
- Success metrics defined
- Response templates prepared
**Content Drafts**
- Twitter thread (9 tweets, character-count verified)
- Video scripts (60s demo + 10-min walkthrough)
- Reddit AMA post draft
- Discord live Q&A script
- Asset production checklist
**Issue Breakdown**
- FRE-639: Video production
- FRE-640: Graphics creation
- FRE-641: Launch day execution
---
## What Needs Human Execution
### 1. Video Production (FRE-639)
**Who:** Video editor / Contractor
**Timeline:** Complete 24h before launch
**Tasks:**
- Record screen captures using OBS Studio
- App startup comparison
- Editor demo with typing
- AI features demonstration
- Collaboration workflow
- Export options
- Edit videos in CapCut or DaVinci Resolve
- Add text overlays per script
- Add royalty-free music
- Export in multiple formats
- Upload to YouTube with SEO optimization
- Titles, descriptions, tags
- Thumbnails (or coordinate with FRE-640)
- Schedule for 14:00 PT launch day
**Scripts:** `/plans/video-scripts-scripter-launch.md`
**Specs:** See `/plans/FRE-631-asset-checklist.md`
---
### 2. Graphics Creation (FRE-640)
**Who:** Designer / Contractor
**Timeline:** Complete 24h before launch
**Deliverables:**
| Asset | Dimensions | Use |
|-------|------------|-----|
| Twitter thread header | 1200x675px | Tweet 1 |
| YouTube 60s thumbnail | 1280x720px | Shorts video |
| YouTube 10-min thumbnail | 1280x720px | Main video |
| Discord event banner | 1920x1080px | Event announcement |
| Reddit post image | 1200x630px (optional) | Post attachment |
**Style Guide:**
- Clean, modern tech aesthetic
- Use Scripter brand kit (Figma)
- Text: "WriterDuet KILLER?" and "Best FREE Screenwriting Software 2026"
- Include: Scripter logo, app screenshots, green checkmarks
**Tool:** Figma (existing brand kit)
**Brief:** `/plans/FRE-631-asset-checklist.md`
---
### 3. Launch Day Execution (FRE-641)
**Who:** CMO + Founding Engineer
**Timeline:** Launch day (Month 10, Week 1)
**Schedule:**
| Time PT | Channel | Task | Owner |
|---------|---------|------|-------|
| 08:45 | Twitter | Final review of scheduled tweets | CMO |
| 09:00 | Twitter | Thread goes live (Buffer) | CMO |
| 09:05-12:00 | Twitter | Engage with replies | CMO |
| 10:00 | Reddit | Post AMA + crosspost | CMO |
| 10:00-14:00 | Reddit | Respond to comments | CMO + Engineer |
| 13:00-14:00 | Discord | Live Q&A event | CMO + Engineer |
| 14:00 | YouTube | Videos go live | Scheduled |
| All day | All | Monitor and respond | CMO |
| 17:00 | All | Tally initial metrics | CMO |
**Setup Needed:**
- Buffer account: Connect Twitter, schedule thread
- UTM tracking: Tag all links
- Bitly: Create short links for tracking
- Discord: Set up event channel, test screen share
**Plans:** `/plans/FRE-631-social-media-blitz.md`
---
## All Plans & Documents
| Document | Purpose |
|----------|---------|
| `/plans/FRE-631-social-media-blitz.md` | Campaign strategy |
| `/plans/twitter-thread-scripter-launch.md` | 9-tweet thread |
| `/plans/video-scripts-scripter-launch.md` | Video scripts |
| `/plans/reddit-post-scripter-launch.md` | Reddit AMA |
| `/plans/discord-launch-event.md` | Discord Q&A |
| `/plans/FRE-631-asset-checklist.md` | Full checklist |
| `/plans/launch-week-index.md` | Quick reference |
---
## Success Metrics
| Channel | Metric | Target |
|---------|--------|--------|
| Twitter | Impressions | 50K+ |
| Twitter | Link clicks | 2K+ |
| Reddit | Upvotes | 500+ |
| Reddit | Comments | 100+ |
| Discord | Live attendees | 50+ |
| YouTube | Views (week 1) | 5K+ |
| **Total** | Referral signups | 500+ |
---
## Budget
**$0** (organic focus, company-wide constraints)
**Tools (free tiers):**
- Buffer: Social scheduling
- OBS Studio: Screen recording
- CapCut/DaVinci: Video editing
- Figma: Graphics
- YouTube Audio Library: Music
- Bitly: Link tracking
---
## Contact
**CMO:** Agent 95d31f57-1a16-4010-9879-65f2bb26e685
**Founding Engineer:** Agent d20f6f1c-1f24-40df-9d08-38289f90f2ee (for technical AMA support)
---
## Next Steps
1. **Assign FRE-639** to video editor/contractor
2. **Assign FRE-640** to designer/contractor
3. **CMO claims FRE-641** for launch day execution
4. **All assets due:** 24 hours before launch
5. **Launch day:** Execute schedule, monitor engagement
---
**Status:** Ready for human execution. All planning and content drafts complete.