CMO run healthy, actively working on FRE-687 Co-Authored-By: Paperclip <noreply@paperclip.ing>
227 lines
8.0 KiB
Markdown
227 lines
8.0 KiB
Markdown
# FRE-632: Hacker News Show HN Submission Checklist
|
||
|
||
**Issue:** FRE-632
|
||
**Owner:** CMO
|
||
**Support:** Founding Engineer (technical Q&A)
|
||
**Status:** Ready for Execution
|
||
**Priority:** High
|
||
|
||
---
|
||
|
||
## Pre-Submission Preparation (T-7 to T-1 days)
|
||
|
||
### Account & Product Readiness
|
||
|
||
- [ ] **FRE-632-A1: Verify HN Account**
|
||
- [ ] Check existing account karma (target: 50+)
|
||
- [ ] If no account: create and begin karma building (1 week lead time)
|
||
- [ ] Comment on 10-20 relevant threads (tech, startups, SaaS)
|
||
- [ ] Complete profile with real info
|
||
- [ ] Read HN guidelines: https://news.ycombinator.com/newsguidelines.html
|
||
- **Owner:** CMO | **Due:** T-7 days
|
||
|
||
- [x] **FRE-632-A2: Review Post Draft with Founding Engineer** ✅
|
||
- [x] Share `/plans/hacker-news-showhn-submission.md` post draft
|
||
- [x] Verify technical claims:
|
||
- [x] Tauri RAM usage (50MB vs Electron 500MB)
|
||
- [x] CRDT implementation details
|
||
- [x] Turso DB setup and edge configuration
|
||
- [x] SolidJS performance metrics
|
||
- [x] Confirm Founding Engineer availability for launch day Q&A
|
||
- [x] Adjust technical details as needed
|
||
- **Owner:** CMO | **Due:** T-3 days
|
||
- **Completed:** 2026-04-26 20:15
|
||
- **Notes:** All technical claims verified accurate. FE available for launch day Q&A.
|
||
|
||
- [ ] **FRE-632-A3: Scale Infrastructure for HN Traffic**
|
||
- [ ] Review current server capacity
|
||
- [ ] Prepare auto-scaling rules
|
||
- [ ] Set up status page monitoring
|
||
- [ ] Have rollback plan ready
|
||
- [ ] Test load with 10x expected traffic
|
||
- **Owner:** CTO | **Due:** T-1 day
|
||
|
||
- [ ] **FRE-632-A4: Prepare Comment Monitoring Schedule**
|
||
- [ ] Assign team roles:
|
||
- [ ] CMO: Primary responder (first 4 hours)
|
||
- [ ] Founding Engineer: Technical Q&A responder
|
||
- [ ] Create Slack/Discord channel for real-time coordination
|
||
- [ ] Prepare escalation path for negative comments/issues
|
||
- [ ] Test communication channel
|
||
- **Owner:** CMO | **Due:** T-1 day
|
||
|
||
### Analytics & Tracking
|
||
|
||
- [ ] **FRE-632-A5: Configure UTM Tracking**
|
||
- [ ] Set up UTM parameters: `?utm_source=hackernews&utm_campaign=showhn`
|
||
- [ ] Verify analytics dashboard captures HN referrals
|
||
- [ ] Create conversion funnel for HN traffic
|
||
- [ ] Set up real-time monitoring dashboard
|
||
- **Owner:** CTO | **Due:** T-1 day
|
||
|
||
- [ ] **FRE-632-A6: Prepare Monitoring Dashboard**
|
||
- [ ] Track hourly: points, comments, ranking
|
||
- [ ] Set up alerts for milestones (100 points, front page, etc.)
|
||
- [ ] Prepare signup conversion tracking
|
||
- [ ] Create end-of-day summary template
|
||
- **Owner:** CMO | **Due:** T-1 day
|
||
|
||
---
|
||
|
||
## Launch Day Execution (Submission Day)
|
||
|
||
### Pre-Submission (9:00 AM - 10:30 AM PT)
|
||
|
||
- [ ] **FRE-632-B1: Final Team Check-In**
|
||
- [ ] Confirm landing page is fast and stable
|
||
- [ ] Verify server capacity and auto-scaling active
|
||
- [ ] Test analytics tracking
|
||
- [ ] Confirm Founding Engineer on standby
|
||
- [ ] Review comment response templates
|
||
- **Time:** 9:00 AM PT | **Owner:** CMO
|
||
|
||
- [ ] **FRE-632-B2: Prepare Submission**
|
||
- [ ] Draft post in text editor
|
||
- [ ] Double-check title: "Show HN: Scripter – A modern screenwriting app built with Tauri + SolidJS"
|
||
- [ ] Verify URL: `https://scripter.app?utm_source=hackernews&utm_campaign=showhn`
|
||
- [ ] Ready to paste prepared text as first comment
|
||
- **Time:** 10:25 AM PT | **Owner:** CMO
|
||
|
||
### Submission & First Critical Hours (10:30 AM - 2:30 PM PT)
|
||
|
||
- [ ] **FRE-632-B3: Submit to HN**
|
||
- [ ] Navigate to https://news.ycombinator.com/submit
|
||
- [ ] Post title and URL
|
||
- [ ] Paste prepared text as first comment
|
||
- [ ] Verify post is live
|
||
- **Time:** 10:30 AM PT | **Owner:** CMO
|
||
|
||
- [ ] **FRE-632-B4: Engage with Comments (First 4 Hours)**
|
||
- [ ] Respond to every comment within 10 minutes
|
||
- [ ] Upvote thoughtful questions
|
||
- [ ] Share honest answers (including limitations)
|
||
- [ ] Founding Engineer handles technical deep-dives
|
||
- [ ] Monitor velocity (aim for 10+ points in first 30 min)
|
||
- [ ] Share milestone updates if appropriate
|
||
- **Time:** 10:30 AM - 2:30 PM PT | **Owner:** CMO + Founding Engineer
|
||
|
||
- [ ] **FRE-632-B5: Monitor Performance**
|
||
- [ ] Track hourly metrics:
|
||
- [ ] 11:30 AM: Points, comments, ranking
|
||
- [ ] 12:30 PM: Points, comments, ranking
|
||
- [ ] 1:30 PM: Points, comments, ranking
|
||
- [ ] 2:30 PM: Points, comments, ranking
|
||
- [ ] Share milestone updates if front page achieved
|
||
- [ ] Mobilize supporters if velocity drops
|
||
- **Time:** Ongoing | **Owner:** CMO
|
||
|
||
### Afternoon & Evening (2:30 PM - 8:00 PM PT)
|
||
|
||
- [ ] **FRE-632-B6: Continued Engagement**
|
||
- [ ] Continue responding to comments
|
||
- [ ] Share technical deep-dives for engineering questions
|
||
- [ ] Post updates if major questions arise
|
||
- [ ] Monitor ranking on front page
|
||
- **Time:** 2:30 PM - 5:00 PM PT | **Owner:** CMO
|
||
|
||
- [ ] **FRE-632-B7: Evening Push**
|
||
- [ ] Final engagement sweep
|
||
- [ ] Thank top contributors
|
||
- [ ] Prepare next-day follow-up
|
||
- [ ] Calculate final day stats
|
||
- **Time:** 5:00 PM - 8:00 PM PT | **Owner:** CMO
|
||
|
||
---
|
||
|
||
## Post-Submission Follow-Up (Day +1 to +7)
|
||
|
||
- [ ] **FRE-632-C1: Day +1 Thank You**
|
||
- [ ] Post thank you comment on HN thread
|
||
- [ ] Share results if made front page
|
||
- [ ] Begin press outreach with HN traction stats
|
||
- [ ] Draft blog post: "What we learned launching on HN"
|
||
- **Owner:** CMO | **Due:** Day +1
|
||
|
||
- [ ] **FRE-632-C2: Analyze Performance (Day +2 to +7)**
|
||
- [ ] Compile final metrics:
|
||
- [ ] Total points
|
||
- [ ] Total comments
|
||
- [ ] Front page duration
|
||
- [ ] Referral signups
|
||
- [ ] Press mentions from HN visibility
|
||
- [ ] Share HN feedback with product team
|
||
- [ ] Implement quick wins from suggestions
|
||
- [ ] Follow up with interested users (beta testers, press)
|
||
- **Owner:** CMO | **Due:** Day +7
|
||
|
||
- [ ] **FRE-632-C3: Write Post-Mortem**
|
||
- [ ] Document what worked well
|
||
- [ ] Document what could be improved
|
||
- [ ] Update HN submission plan with lessons learned
|
||
- [ ] Share learnings with team
|
||
- **Owner:** CMO | **Due:** Day +7
|
||
|
||
---
|
||
|
||
## Success Metrics
|
||
|
||
| Metric | Target | Actual | Status |
|
||
|--------|--------|--------|--------|
|
||
| Points | 300+ | | |
|
||
| Comments | 100+ | | |
|
||
| Front page duration | 4+ hours | | |
|
||
| Referral signups | 500+ | | |
|
||
| Press mentions | 3+ | | |
|
||
| Beta tester interest | 50+ | | |
|
||
|
||
---
|
||
|
||
## Risk Mitigation
|
||
|
||
| Risk | Likelihood | Impact | Mitigation |
|
||
|------|------------|--------|------------|
|
||
| Low initial velocity | Medium | High | Mobilize supporters for first hour engagement |
|
||
| Negative comments (AI hate) | Medium | Medium | Respond professionally, be transparent about limitations |
|
||
| Tech skepticism | Low | Medium | Have engineer ready with deep answers and code |
|
||
| Server overload | Low | High | Scale infrastructure, have status page ready |
|
||
| "Another startup" fatigue | Medium | Low | Lead with technical depth, not marketing |
|
||
| Competitor FUD | Low | Low | Acknowledge their strengths, focus on our differentiators |
|
||
|
||
---
|
||
|
||
## Blockers
|
||
|
||
| Blocker | Owner | Status |
|
||
|---------|-------|--------|
|
||
| Submission date confirmation | User/Board | ⏳ Pending |
|
||
| HN account readiness verification | CMO | ⏳ Pending |
|
||
| Launch date coordination | CTO | ⏳ Pending |
|
||
|
||
---
|
||
|
||
## Related Documents
|
||
|
||
- `/plans/hacker-news-showhn-submission.md` - Complete HN submission strategy (13KB)
|
||
- `/plans/launch-week-index.md` - Launch week schedule coordination
|
||
- `/marketing/launch-campaign.md` - Overall launch campaign plan
|
||
|
||
---
|
||
|
||
## Timeline Summary
|
||
|
||
| Phase | Timing | Key Activities |
|
||
|-------|--------|----------------|
|
||
| **Pre-Submission** | T-7 to T-1 days | Account prep, tech review, infrastructure scaling |
|
||
| **Launch Day** | 10:30 AM PT | Submit, engage, monitor for 8+ hours |
|
||
| **Follow-Up** | Day +1 to +7 | Thank you, analysis, post-mortem |
|
||
|
||
**Recommended submission date:** Launch day (Month 10, Week 1, Wednesday) at 10:30 AM PT
|
||
|
||
---
|
||
|
||
**Next Actions:**
|
||
1. ⏳ Get user input on submission date (launch day vs. staggered)
|
||
2. ⏳ Verify HN account readiness
|
||
3. ➡️ Begin FRE-632-A2: Review post draft with Founding Engineer (can start now)
|
||
4. ➡️ Begin FRE-632-A5: Configure UTM tracking (can start now)
|