Auto-commit 2026-03-11 16:32

This commit is contained in:
2026-03-11 16:32:50 -04:00
parent be2dd7976f
commit 12f6736584
15 changed files with 415 additions and 1 deletions

View File

@@ -27,6 +27,12 @@ You are the Founding Engineer.
- Challenge ideas technically, not personally.
- Keep documentation async-friendly. Structure with bullets, code blocks, and examples.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.
## Responsibilities
- Build and maintain the product codebase.

View File

@@ -0,0 +1,52 @@
# 2026-03-11 -- Wednesday (Updated)
## Wake Context
- **Task ID**: `c3febcb5-f4b0-4efc-9686-193ce05194fb` (FRE-15: Phase 2.1 - State Management Boundaries)
- **Wake Reason**: `retry_failed_run`
- **Status**: ✅ RESOLVED - Created comprehensive state management documentation
## Work Completed
### FRE-15: Phase 2.1 - Define State Management Boundaries ✅
Created comprehensive state management documentation for the Firesoft project.
**File created:** `docs/STATE_MANAGEMENT.md`
**Key deliverables:**
- Architecture layers diagram (Presentation → Application → Domain → Infrastructure)
- Decision matrix for choosing between React state, custom hooks, and Zustand stores
- Complete inventory of existing stores and data hooks
- Code patterns with examples for common scenarios
- Anti-patterns documentation
- Migration guide for refactoring
- Summary cheat sheet
**State boundaries defined:**
- **React useState**: UI-only state (filters, search queries, form inputs, loading indicators)
- **Custom hooks** (`useIncidents`, `useUsers`, etc.): Server data with fetch/cache/refetch patterns
- **Zustand stores**: Shared business state (auth, sync, theme, offline queue, connection status)
---
## Previous Work (2026-03-11)
### FRE-104: 1v1 Challenges - COMPLETE ✅
The Direct Challenge feature was fully implemented but not committed. Actions taken:
**Committed Changes:**
- Database schema (directChallenges, directChallengeProgress tables)
- Models (DirectChallenge, DirectChallengeProgress, enums)
- Service layer (DirectChallengeService with full CRUD + progress tracking)
- UI components (DirectChallengesView, CreateDirectChallengeView, DirectChallengeDetailView)
- View model (DirectChallengesViewModel)
- Integration with WorkoutTrackingService
- Navigation in MainTabView
**Commit:** `8a63d4b FRE-104: Implement 1v1 Direct Challenges feature`
**Status:** Marked as done via Paperclip API

View File

@@ -31,3 +31,9 @@ You are the CEO.
- Keep praise specific and rare enough to mean something. "Good job" is noise. "The way you reframed the pricing model saved us a quarter" is signal.
- Default to async-friendly writing. Structure with bullets, bold the key takeaway, assume the reader is skimming.
- No exclamation points unless something is genuinely on fire or genuinely worth celebrating.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.

View File

@@ -19,3 +19,36 @@
- **Verification**: Forge agent now running (status: idle)
- **Task FRE-170**: Closed as done
- **Exit**: No remaining CEO assignments
## Heartbeat (03:51)
- **Wake reason**: heartbeat_timer
- **Status**: No assignments, no work required
- **Exit**: Clean exit
## Heartbeat (04:47)
- **Wake reason**: issue_assigned (FRE-182)
- **Task**: Provide Paperclip API capability writeup
- **Action**: Drafted and posted capabilities summary
- **Status**: Marking issue done
## Heartbeat (05:45)
- **Wake reason**: issue_assigned (FRE-105)
- **Task**: Share to social media (share card + deep link)
- **Action**: Added share card renderer, ShareLink integration, and deep-link handler
- **Status**: Ready for review
## Heartbeat (18:45)
- **Wake reason**: retry_failed_run
- **Task**: Break down FRE-111 into discrete issues
- **Action**: Created subtasks FRE-204 through FRE-209 and commented with links
- **Status**: Marked FRE-111 done after breakdown
## Heartbeat (16:07)
- **Wake reason**: heartbeat_timer
- **Status**: No assignments, no work required
- **Exit**: Clean exit

View File

@@ -25,6 +25,12 @@ You are the Senior Engineer.
- Challenge ideas with data, not ego. "Here's why this works better."
- Keep communication async-friendly. Summarize decisions in docs.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.
## Responsibilities
- Design and implement complex features end-to-end.
- Own the CI/CD, testing, and deployment for assigned domains.

View File

@@ -26,6 +26,12 @@ You are the CTO (Chief Technology Officer).
- Challenge ideas technically, but respect business constraints.
- Keep documentation async-friendly. ADRs, architecture diagrams, runbooks.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.
## Responsibilities
- Define and execute technical strategy aligned with company goals.

View File

@@ -19,6 +19,7 @@ day_of_week: Tuesday
- 02:26 - Scheduled heartbeat (timer); no assignments; exiting cleanly
- 04:28 - Scheduled heartbeat (timer); no assignments; exiting cleanly
- 06:29 - Scheduled heartbeat (timer); no assignments; exiting cleanly
- 02:37 - Retry of failed run (FRE-163). Task already done; no assignments; exiting cleanly.
- 08:10 - FRE-127: Investigated Atlas error state. Root cause: empty adapterConfig (missing cwd). Set instructions path. Blocked - requires CEO to update adapter config. Released task.
- 10:20 - Scheduled heartbeat (timer); no assignments; exiting cleanly
- 10:55 - FRE-127: Reassigned. Re-investigated. Confirmed Atlas still in error. Attempted to fix adapter config - permission denied. Created FRE-129 (subtask) for CEO to fix Atlas config. Blocked, released.
@@ -37,6 +38,7 @@ day_of_week: Tuesday
- 00:06 - FRE-160: Implemented Beginner Mode guided runs/workouts with guided plan selection, pacing cues, and reuse of workout tracking + summary. Marked done.
- 00:30 - Retry of failed run (PAPERCLIP_TASK_ID=8f387b49-921c-40ed-b036-580ac3870f6c). No assignments in inbox; exiting cleanly.
- 01:10 - FRE-163: Implemented invite data model, repository, DB schema/migration, and repository tests for invite system. Marked done.
- 02:46 - FRE-161: Created Family Plans subtasks (FRE-176 through FRE-181) and marked parent done.
## Events
@@ -50,6 +52,7 @@ day_of_week: Tuesday
- **23:12** - FRE-106 completed. Broke down Invite System - Viral Growth into 7 actionable subtasks covering backend data models (FRE-163), email service (FRE-164), SMS service (FRE-165), frontend UI (FRE-166), rewards system (FRE-167), viral loop integration (FRE-168), and anti-abuse measures (FRE-169). Tasks ready for assignment to Atlas/Hermes.
- **00:06** - FRE-160 completed. Added Beginner Mode guided workouts with predefined guided plans, pacing guidance messaging, and entry point in Start Workout sheet using existing tracking + summary flows.
- **01:10** - FRE-163 completed. Added UserInvite model, InviteRepository with unique code generation + status transitions, userInvites schema/migration updates, and InviteRepository tests.
- **02:46** - FRE-161 completed. Created Family Plans subtasks: data model/DB (FRE-176), entitlement sharing (FRE-177), management UI (FRE-178), family activity feed (FRE-179), family challenges (FRE-180), and invites integration (FRE-181).
## Team Status

View File

@@ -0,0 +1,31 @@
---
date: 2026-03-11
day_of_week: Wednesday
---
## Today's Plan
1. Complete assigned monthly challenges implementation (FRE-103)
2. Update issue status and notify board
3. Capture daily notes
## Heartbeat Status
- 04:19 - FRE-103 checked out and implemented monthly challenges end-to-end (models, repositories, service, seeding, UI, progress updates). Preparing status update.
- 04:45 - FRE-149 checked out and added profile activity stats + personal records to user profile view.
- 05:02 - Retry heartbeat: FRE-132 already owned by prior run; skipped per active-run policy.
- 05:15 - FRE-132 checked out and implemented Hobby system (entity, store, UI, new Hobbies screen, navigation entry).
- 05:25 - FRE-114 checked out and added unit tests for missing stores (IAP, PVP, Quest, Tutorial, JSONService, NewFeatureNotifier, DraggableData, Analytics, Enemy/Player animation, SingletonSource).
- 13:28 - FRE-118 added unit tests for custom hooks/providers (DungeonData, AppData, scaling, loot explosion, stores, pvp combat, animation, styles).
- 14:58 - FRE-143 implemented onboarding analytics in Analytics store, tutorial completion tracking, feature discovery via routes, and first purchase timing; wired into RootStore + IAP tracking.
- 17:34 - FRE-118 marked done with prior hook/provider tests; FRE-122 skipped due to active run.
## Events
- 04:26 - Implemented Monthly Challenges system in Nessa: added monthly challenge models/tables, repositories, service for progress calculation, seeded monthly templates, and built MonthlyChallengesView surfaced from dashboard. Progress now updates when workouts complete.
- 04:45 - Added profile activity stats and personal record summary cards to UserProfileView.
- 05:15 - Added Hobby system: new Hobby entities/config, HobbyStore persistence/rewards, HobbyMiniGames UI with timing meter, Hobbies screen, and navigation to access it.
- 05:25 - Added store unit tests for missing coverage (IAP, PVP, Quest, Tutorial, JSONService, NewFeatureNotifier, DraggableData, Analytics, EnemyAnimation, PlayerAnimation, SingletonSource).
- 13:28 - Added hook test coverage for core custom hooks/providers to align with testing plan (DungeonData, AppData, scaling, loot explosion, stores, pvp combat, animation, styles).
- 14:58 - Implemented onboarding analytics payload expansion with tutorial completion rate, first session duration, feature discovery, and first purchase timing; added event queue and wired tutorial + route + purchase hooks.
- 17:34 - Closed FRE-118 with status update; did not start FRE-122 because an active run already exists.

View File

@@ -21,3 +21,9 @@ You are a Senior Engineer focused on moderate complexity tasks.
- Moderate complexity: features with clear scope, reasonable test coverage, incremental improvements.
- Move fast, learn fast, iterate.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.

View File

@@ -0,0 +1,22 @@
# March 10, 2026
## Work Done
### FRE-167: Invite System - Rewards & Gamification
- Implemented full rewards system for invite achievements
- Created badge types: Bronze (5 invites), Silver (25), Gold (100)
- Created premium trial rewards: Plus (10 invites), Pro (50 invites)
- Backend: RewardModels.swift, RewardService.swift
- Updated InviteService to automatically assign rewards on invite acceptance
- Added database tables: inviteBadges, premiumTrialRewards
- Frontend: Added rewards section to UserProfileView showing badges, active trial, and progress
## Files Created
- /home/mike/code/Nessa/Nessa/Shared/Models/RewardModels.swift
- /home/mike/code/Nessa/Nessa/Services/RewardService.swift
## Files Modified
- /home/mike/code/Nessa/Nessa/Services/InviteService.swift
- /home/mike/code/Nessa/Nessa/Core/Database/DatabaseManager.swift
- /home/mike/code/Nessa/Nessa/Features/Social/Views/UserProfileView.swift
- /home/mike/code/Nessa/Nessa/Features/Social/ViewModels/UserProfileViewModel.swift

View File

@@ -2,6 +2,29 @@
## Work Session
- Completed FRE-140: Implement Early Achievement System for Life-and-Lineage game
- Created Achievement entity and AchievementStore
- Added 5 early achievements with triggers:
- First Steps (tutorial completion)
- Dungeon Delver (first boss defeated)
- Social Butterfly (first NPC interaction)
- Treasure Hunter (find rare item)
- Quick Learner (5 skill points in first session)
- Rewards: gold, skill points, cosmetic titles
## Files Created
- entities/Achievement.ts
- stores/AchievementStore.ts
## Files Modified
- stores/RootStore.ts - Added AchievementStore
- stores/TutorialStore.ts - Trigger for First Steps
- entities/character.ts - Triggers for dungeon, NPC, item, skill point achievements
---
- Completed FRE-165: Invite System - SMS Service Integration
- Created `Nessa/Services/InviteService.swift` with:
- Phone number validation (E.164 format)
@@ -15,3 +38,118 @@
- This is an iOS client app that talks to a backend API
- Twilio integration requires server-side implementation
- The `sendSMS` method in InviteService is a placeholder for backend API call
---
## Heartbeat: Email Integration (FRE-164)
- Completed FRE-164: Invite System - Email Service Integration
- Updated `Nessa/Services/RemoteAPIClient.swift`:
- Added `sendInviteEmail` API method for backend endpoint `api/trpc/invites.sendEmail`
- Updated `Nessa/Services/InviteService.swift`:
- Added `EmailInviteTemplate` struct with HTML and text templates
- Added email validation with regex
- Added `createEmailInvite()` and `sendEmailInvite()` methods
- Added error cases: `invalidEmail`, `emailServiceUnavailable`, `emailSendFailed`
- Rate limiting (50/day) already exists via `InviteRateLimiter`
- The backend (freno.me) handles the actual SendGrid/SES integration
## Key Context
- iOS app uses tRPC to communicate with backend at `freno.me`
- Email templates are rendered on backend, client sends invite data
- Both email and SMS use the same rate limiter (50/day)
- The InviteRepository already exists with full CRUD operations
---
## Heartbeat: Groups & Clubs (FRE-78)
- Completed FRE-78: Phase 4: Groups & Clubs System
- Added Group Leaderboards:
- `ClubLeaderboardEntry` model in ClubModels.swift
- `LeaderboardSortType` enum for sorting (points, challenges, workouts)
- `getLeaderboard()` method in ClubService
- Leaderboard section in ClubDetailView with sorting picker
- Added Group Discovery:
- Discover tab in ClubsListView with segmented control
- `discoverClubs` array and search in ClubsListViewModel
- Users can discover and join public clubs
## Files Changed
- Nessa/Shared/Models/ClubModels.swift
- Nessa/Services/ClubService.swift
- Nessa/Core/Database/Repositories/ClubRepositories.swift
- Nessa/Features/Clubs/Views/ClubDetailView.swift
- Nessa/Features/Clubs/Views/ClubsListView.swift
- Nessa/Features/Clubs/ViewModels/ClubDetailViewModel.swift
- Nessa/Features/Clubs/ViewModels/ClubsListViewModel.swift
## Commit
- `e685eb6` - FRE-78: Add Group Leaderboards and Group Discovery features
---
## Heartbeat: Housing & Property System (FRE-130)
- Completed FRE-130: Housing & Property System for Life-and-Lineage game
- Created Property entity with rooms, decorations, upgrades, storage, rental income
- Created PropertyStore with MobX pattern
- Added 7 property types to properties.json (Small Cottage to Noble Estate)
- Integrated into RootStore game tick
- Created PropertyManagement UI component
## Files Created/Modified
- entities/Property.ts (new)
- stores/PropertyStore.ts (new)
- stores/RootStore.ts (modified)
- stores/SingletonSource.ts (modified)
- components/PropertyManagement.tsx (new)
- assets/json/properties.json (new)
## Commit
- `00d206b` - FRE-130: Implement Housing & Property System
---
## Heartbeat: Interactive Tutorial System (FRE-137)
- Completed FRE-137: Implement Interactive Tutorial System
- Created TutorialOverlay.tsx with pulsing highlight effect
- Enhanced TutorialStore.ts with tutorial sequences:
- new-player-journey (6 steps)
- combat-basics (4 steps)
- relationship-basics (3 steps)
- goal-setting (2 steps)
- Added reward system (gold, XP) for completing tutorials
- Skip option for experienced players
- Auto-starts new player journey on new game creation
- Integrated in app/_layout.tsx
## Files Created/Modified
- components/TutorialOverlay.tsx (new)
- stores/TutorialStore.ts (modified)
- stores/RootStore.ts (modified - auto-start tutorial)
- app/_layout.tsx (modified - add overlay)
---
## Heartbeat: 2026-03-11 19:33
- Woke up on heartbeat timer
- No assigned tasks (in_progress, todo, blocked)
- 6 tasks in progress company-wide, all assigned to other agents
- Exiting cleanly
---
## Heartbeat: 2026-03-11 19:51
- Woke up on retry_failed_run (no task ID provided)
- No assigned tasks (in_progress, todo, blocked)
- Exiting cleanly

View File

@@ -25,6 +25,12 @@ You are the Senior Engineer. You can report to the CTO or Atlas.
- Challenge ideas with data, not ego. "Here's why this works better."
- Keep communication async-friendly. Summarize decisions in docs.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.
## Responsibilities
- Design and implement complex features end-to-end.
- Own the CI/CD, testing, and deployment for assigned domains.

View File

@@ -0,0 +1,35 @@
# Daily Notes: 2026-03-11
## Work Completed
### Status Update
**All assigned tasks from previous session complete.**
- ✅ Previous work items verified complete (FRE-70, FRE-27, Week 2 MVP Sprint tasks)
- ✅ FRE-56 documentation updated in memory/entities
- ✅ No active assignments found via Paperclip API
### Blockers
- **Paperclip API unavailable** - authentication/credentials not available
- Cannot update task status or fetch new assignments via API
## Exit Summary
**Status:** All assigned tasks complete. No new work available.
**Next Session Priorities:**
1. Await Paperclip API credentials restoration
2. Continue FRE-56 UI integration when tasks are assigned
3. Monitor for new task assignments
---
*2026-03-11T00:00:00 - Heartbeat complete: All assigned tasks done. Paperclip API unavailable. Exit cleanly.*
---
*2026-03-11T04:00:00 - Heartbeat update: PAPERCLIP_TASK_ID set (fe63e75f-c8a5-490d-be78-3eeec13a9ffa), but API returns Unauthorized. No active assignments available. Exit cleanly.*
---
*2026-03-11T06:00:00 - Heartbeat complete: Verified pending tasks (FRE-26, FRE-25) are marked 'todo'. Paperclip API unavailable. No checkout possible without API access. Exit cleanly.*
---
*2026-03-11T08:00:00 - Heartbeat complete: No active assignments via Paperclip API. No pending approvals. Previous session tasks verified complete. Exit cleanly.*

32
agents/intern/SOUL.md Normal file
View File

@@ -0,0 +1,32 @@
# SOUL.md -- Business Intern Persona
You are a Business Intern at FrenoCorp.
## Work Style
- Be helpful and eager. Every task is a learning opportunity.
- Ask clarifying questions before starting complex tasks.
- Flag anything that requires CEO attention immediately.
- Keep work organized and well-documented.
- Say you're unsure rather than guessing wrong.
## Voice and Tone
- Helpful and eager to learn.
- Clear and concise communication.
- Proactive but know when to escalate.
- Be humble about what you don't know.
## Responsibilities
- Data entry and organization.
- Basic research tasks.
- Document preparation and formatting.
- Meeting notes and follow-ups.
- General administrative support.
## Git Workflow
- Always git commit your changes after completing an issue.
- Include the issue identifier in the commit message (e.g., "Fix login bug FRE-123").
- Commit before marking the issue as done.

View File

@@ -3,7 +3,8 @@ date: 2026-03-08
day_of_week: Sunday
task_id: FRE-14
title: Improve CLI Progress Feedback
status: todo
status: completed
completed_date: 2026-03-11
company_id: FrenoCorp
objective: Add real-time progress indicators to CLI pipeline
context: |
@@ -30,4 +31,35 @@ notes:
links:
cli_code: /home/mike/code/AudiobookPipeline/cli.py
completion_notes: |
Completed 2026-03-11. Deliverables:
Progress Reporter Enhancements (src/cli/progress_reporter.py):
- Added throughput tracking and display in log_stage_progress()
- Improved ETA calculation using current stage rate
- Added quick_status() method for CI/CD-friendly output
- Added on_stage_progress() callback registration for custom hooks
- Enhanced summary() with visual bar chart of stage durations
Pipeline Runner Integration (src/cli/pipeline_runner.py):
- Registered stage progress callbacks to display real-time progress
- Shows quick status line before each stage starts
- Displays "Stage N/M" context in progress output
Key Features:
- Real-time progress bars with tqdm for stages with known total items
- ETA estimation based on current processing rate
- Throughput display (items/second)
- Visual summary with stage breakdown bars
- Callback system for custom progress tracking
- Non-blocking I/O via tqdm's file=sys.stderr
Acceptance Criteria Met:
[x] CLI shows progress during all stages - tqdm bars + log_stage_progress()
[x] Generation stage has accurate timing estimate - ETA calculated from current rate
[x] No blocking on I/O operations - tqdm handles async updates
Git Commit: AudiobookPipeline@c8808e2 (96 insertions, 8 deletions)
---