forked from Mike/freno-dev
FRE-323. The one-click remote install is app-UI-only and needs hand-edited ~/.ssh/config plus a one-time ssh-copy-id (FRE-320); FRE-315 and FRE-322 hold the claim unverified and demo-gated. - drop the Remote tile and its mock from the feature collage - drop the "Any SSH box, one click away" breakdown, its demo and bullets - drop "Works across every hooked agent, local or remote" - drop the "One-click SSH setup" chip - move the copy to marketing/drafts/remote-ssh/ and mark remote held in marketing/positioning.md No replacement claim was added. Deploy waits on a push credential for the GitHub repo Vercel builds.
29 lines
1.5 KiB
Markdown
29 lines
1.5 KiB
Markdown
# Why the remote claim is parked
|
|
|
|
The site was selling a setup path a buyer does not get.
|
|
|
|
FRE-320 measured today's actual path (2026-10-29): the one-click flow is
|
|
app-UI-only, needs a hand-edited `~/.ssh/config` for any host not already in ssh
|
|
config or on the tailnet, needs a one-time `ssh-copy-id` because the app runs ssh
|
|
with `BatchMode=yes`, and has no manual fallback for minting the per-host
|
|
credential. FRE-315 and FRE-322 §3 correction 4 marked the remote claim
|
|
unverified and demo-gated. The CTO named it the largest launch risk because it
|
|
was already in front of buyers.
|
|
|
|
So the landing page now says only what the product can back today: local agents,
|
|
the card, and the notch. The remote story is not deleted — it is parked here with
|
|
the FRE-320/FRE-205 work so it can return the day the one-click install ships and
|
|
is recorded.
|
|
|
|
## What has to be true before it returns
|
|
|
|
| Requirement | Owner | Date |
|
|
|---|---|---|
|
|
| One-click install ships without hand-edited `~/.ssh/config` or `ssh-copy-id` | FRE-320/FRE-205 engineering | When FRE-320/FRE-205 ships |
|
|
| CTO verifies the shipping flow and records the evidence on FRE-320 | CTO | Same day, before any copy moves |
|
|
| A recording shows a remote agent joining the island | Sponsor/CMO | Before restore |
|
|
| Restore copy and rebuild the launch plan with an owner + date per item | CMO | Day the three rows above are true |
|
|
|
|
Nothing in this folder is publishable. `marketing/approved/` remains the only
|
|
place a human publishes from.
|