Files
freno-dev/marketing/briefs/registry-wave-2.md
fixture 680563e3f9 marketing: FRE-199 registry wave-2 brief — targets verified, copy inherited from signed claims
Five wave-2 candidates fetched live 2026-11-05 (awesome-macOS 19.4k ★,
1000.tools, uneed.best, devhunt.org; Product Hunt bot-walled and marked
on-screen-read). Copy inherits FRE-207's CTO-signed claims only; price line
stays 'Free 14-day trial', no number (G2). Submission gated on the wave-1
readback and G3/G4. Copy target was Fri 2026-11-13; ready 2026-11-05.
2026-11-05 20:15:30 +00:00

92 lines
5.4 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Registry wave 2 — brief and copy (FRE-199 item 3)
**Owner:** CMO prepares · sponsor submits · **Copy ready 2026-11-05** (target was
Fri 2026-11-13) · **Submit:** week of 2026-11-16, after the wave-1 readback.
**Status:** `briefs/` — nothing here has been posted; humans hold every account;
no agent authenticates, posts or sends.
## What wave 2 is, and what it waits for
Wave 1 is FRE-207's packet (`The-Nook` worktree `drafts/directory-submissions.md`
+ `drafts/click-list.md`): 8 targets, CTO claim verdict applied 2026-11-01
(C1–C5 signed, C7 refused → relay sentence), sponsor-owned inputs G2 (price
line), G3 (`@freno.me` mailbox), G4 (screenshots). **Wave-2 submission waits on
the wave-1 readback** — what actually got submitted, what got listed, what was
rejected and why — so targets can be re-ranked on evidence instead of guesswork.
The readback lives on the FRE-207 issue; this brief is ready either way.
**Copy rule inherited from wave 1:** paste the wave-1 blocks, do not improvise.
Only claims signed by the CTO verdict ship:
- C1 — works with 18 coding agents (compatibility fact, not a competitor mention).
- C2 — answer an agent's approval from your Mac, iPhone or Watch.
- C3 — sessions keep arriving while the Mac app is closed (widgets; fleet status only).
- C4 — macOS 14.2+, universal.
- C5 — iPhone/iPad and Apple Watch companions are **TestFlight beta**; no App Store link anywhere.
- C7 — "no cloud service of its own" is refused; block D ships the relay sentence.
- **Price line (G2):** "Free 14-day trial" only — no number — until CoS + sponsor
clear the "$10 one-time licence" line for public listings (FRE-204 holds $10 in-app;
the listing text is a separate publish decision).
- Banned: superlatives, user counts, testimonials, competitor names.
## Targets — fetched live 2026-11-05, marked per the wave-1 legend
| # | Target | What it is | How it ships | Fit | Verified |
|---|---|---|---|---|---|
| W2-1 | `iCHAIT/awesome-macOS` (19.4k ★) | Curated macOS app list; PR-based | PR adding one line to the relevant section from `contributing.md`; copy: block A + block B compressed | High — category fit, persistent link | ✅ repo + contributing rules read 2026-11-05 |
| W2-2 | 1000.tools | Curated tool directory, self-serve categories (AI, developer tools, productivity) | Category submission form; copy: block A + B | Medium-high | ✅ fetched 2026-11-05 (categories listed on page) |
| W2-3 | uneed.best | Daily product launch site | Launch submission (account needed, held by a human) | Medium — launch-format, needs assets | ✅ fetched 2026-11-05 |
| W2-4 | devhunt.org | Daily dev-tool launches | Launch submission | Medium | ✅ fetched 2026-11-05 |
| W2-5 | Product Hunt | Launch site | Maker/hunter flow, on-screen (403 to plain fetch — read live before filing) | Low-medium this wave; big-audience launch usually wants FRE-203's launch-day coordination | ⚠️ bot-walled; fields read on screen |
Re-rank after the wave-1 readback: if directory listings (wave-1 §1/§3–5)
produced traffic or referrers, wave 2 leads with W2-1/W2-2; if nothing was
submittable, wave 2 waits until G3/G4 clear rather than submitting half-copy.
## Copy — paste-ready, inheriting the signed claims only
**One-liner (≤60):** `Your coding agents, at the edge of the screen` (43 chars — wave-1 block A).
**Short description (~250 chars):** wave-1 block B verbatim; if a field forces a
price, "Free 14-day trial" and no number (G2).
**awesome-macOS PR line (one row, section: menu-bar / status-bar apps or the
section the maintainers route notch apps to — read the README section headers
before filing):**
```
- [The Nook](https://nook.freno.me/) - Puts every coding-agent session at the
edge of your screen and lets you answer approvals from your Mac, iPhone or
Watch. Works with 18 coding agents. [![Open-Source Software][OSS Icon]] — not
open source; omit the badge row, keep the description.
```
(The badge syntax is copied from the list's own rows; The Nook is not open
source, so the OSS badge is **omitted** — the line above shows the shape only.
No TestFlight mention needed in a one-row listing; add "Companions for iPhone
and Apple Watch (TestFlight beta)" only if the PR reviewer asks for platform
detail — C5 wording.)
**Launch-site fields (W2-3/W2-4):** wave-1 blocks A, B, C (widgets — fleet
status only), D (relay sentence, not C7's refused wording). Gallery needs G4's
three real screenshots.
## Gates before anything here is submitted
| Gate | Owner | State |
|---|---|---|
| Wave-1 readback recorded (what submitted/listed/rejected) | sponsor → FRE-207 issue, carried to FRE-199 | owed before submission week |
| G2 price line for public listings | CoS + sponsor | pending (copy ships without a number either way) |
| G3 `hello@freno.me` mailbox | sponsor | pending |
| G4 three real screenshots + logo PNG | sponsor or CTO | pending — blocks every upload field |
| Claim sign-off | CTO | **cleared 2026-10-31** for C1–C5; C7 ships as the relay sentence |
## Provenance
- Targets fetched 2026-11-05: uneed.best, devhunt.org, 1000.tools (HTTP 200,
content read); `iCHAIT/awesome-macOS` via GitHub API (19,441 stars,
contributing.md linked from README); producthunt.com returns 403 to a plain
fetch — marked ⚠️, read on screen before filing.
- All claims inherited from FRE-207's CTO verdict of 2026-10-31 — no new
claims introduced by this brief.