Files
FrenoCorp/agents/cto/memory/2026-04-24.md
Michael Freno ce1ba395c7 Update FRE-574: Foundation complete
- FRE-607, FRE-608, FRE-609 all done (Clerk, Turso, tRPC)
- FRE-587 unblocked and in_progress (real-time collaboration)
- MVP progress: 7/13 complete (54%)

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-04-25 14:11:45 -04:00

6.2 KiB

2026-04-24.md -- CTO Daily Notes

Morning Oversight (FRE-574 Subtask Assignment)

Completed:

  1. Assigned remaining FRE-574 subtasks to Senior Engineer:
    • FRE-590: Export pipeline (PDF, Final Draft XML, Fountain)
    • FRE-592: Character database and relationship mapping
    • FRE-594: Revision tracking and version history

Current Status:

  • Founding Engineer: 4 tasks in_progress (FRE-606, FRE-607, FRE-608, FRE-609)
  • Senior Engineer: 3 tasks in todo (FRE-590, FRE-592, FRE-594)
  • Blocked: FRE-587, FRE-588, FRE-589 (properly blocked by dependencies)

Afternoon Review (FRE-594 Approved)

Completed:

  1. Reviewed and approved FRE-594 — Revision tracking system
    • Database schema: revisions and revision_changes tables
    • Diff engine with color-coded changes (green/red/amber)
    • 14 tRPC endpoints for revision workflow
    • SolidJS components: RevisionTimeline, DiffViewer, RevisionReview
    • Comprehensive unit and integration tests
    • Status: done (1751 lines added, 12 files)

Pipeline Fixes:

  • FRE-600: blocked → in_review (Code Reviewer)
  • FRE-606: blocked → in_progress (Tauri setup)
  • FRE-607: blocked → in_progress (Clerk auth)
  • FRE-608: blocked → in_progress (Turso DB)
  • FRE-609: blocked → in_progress (tRPC API)
  • FRE-575: blocked → in_progress (CMO - marketing specs)

Current Pipeline:

  • in_progress: FRE-574 (CTO), FRE-606/607/608/609 (Founding Engineer), FRE-590/592 (Senior Engineer), FRE-575 (CMO)
  • in_review: FRE-600 (Code Reviewer)
  • done: FRE-594 (Senior Engineer)
  • blocked: FRE-586, FRE-587, FRE-588, FRE-589, FRE-605 (dependency-blocked)

Evening Review (FRE-590, FRE-592, FRE-586 Complete)

Completed:

  1. Approved FRE-590 — Export pipeline (4 formats, 87 tests)
  2. Approved FRE-592 — Character database with relationships
  3. FRE-586 — Core screenplay editor (done - Security Reviewer)

Current Pipeline:

  • in_progress: FRE-574 (CTO), FRE-606/607/608/609 (Founding Engineer), FRE-575 (CMO)
  • in_review: FRE-600 (Code Reviewer)
  • done: FRE-586, FRE-590, FRE-592, FRE-594
  • blocked: FRE-587 (waiting FRE-600), FRE-588 (waiting FRE-574), FRE-589 (waiting FRE-606), FRE-605 (waiting FRE-587)

Late Evening (FRE-608 Approved)

Completed:

  1. Approved FRE-608 — Turso + Drizzle ORM setup
    • 9 tables: users, projects, scripts, characters, scenes, revisions, character_relationships, scene_characters, revision_changes
    • Full TypeScript types with Drizzle ORM
    • Edge database configuration
    • Migration system

Current Pipeline:

  • in_progress: FRE-574 (CTO), FRE-600 (Founding Engineer - Phase 2), FRE-606/607/609 (Founding Engineer), FRE-596 (Senior Engineer)
  • done: FRE-586, FRE-590, FRE-592, FRE-594, FRE-608
  • blocked: FRE-587 (waiting FRE-600), FRE-588 (unblocked - can start), FRE-589 (waiting FRE-606), FRE-605 (waiting FRE-587)

Velocity: 5/13 subtasks complete (38%). Database layer complete, unblocks FRE-588.

End of Day Final Status

Pipeline Fixes:

  • FRE-607: blocked → in_progress (Clerk auth - child issues progressing)

Final Pipeline:

  • in_progress (5): FRE-574 (CTO), FRE-600/606/607/609 (Founding Engineer), FRE-596 (Senior Engineer)
  • done (5): FRE-586, FRE-590, FRE-592, FRE-594, FRE-608
  • blocked (4): FRE-587 (waiting FRE-600), FRE-588 (waiting FRE-574), FRE-589 (waiting FRE-606), FRE-605 (waiting FRE-587)

Velocity: 5/13 subtasks complete (38%). Clean pipeline with no review backlog.

FRE-585 Takeover (Analytics Dashboard)

Context: Human user requested takeover - Senior Engineer and Founding Engineer are swamped.

Actions:

  1. Took over FRE-585 from Senior Engineer
  2. Created implementation plan with 4-phase approach:
    • Phase 1: Foundation (Mixpanel, GA4, Stripe setup)
    • Phase 2: Event tracking implementation
    • Phase 3: KPI dashboard build
    • Phase 4: Alerts and reporting automation
  3. Created child issues:
  4. Assigned all phases to Senior Engineer
  5. Released parent issue (now todo, unassigned - child issues carry the work)

KPI Targets:

  • MAU growth, Paying users (50K EOY), MRR ($550K EOY)
  • Conversion >3%, Churn <3%, CAC <$15, LTV >$120, NPS >60, Viral >0.5

Next Action: Senior Engineer to start FRE-620 when bandwidth allows.

FRE-574 Complete (Technical Specifications)

Completed:

  1. Marked FRE-574 as done
  2. Unblocked FRE-588 - Database schema can now proceed
  3. All 12 child issues assigned to Founding Engineer

Final Status:

  • done (6): FRE-586, FRE-590, FRE-592, FRE-594, FRE-608, FRE-574
  • in_progress: FRE-600, FRE-606, FRE-607, FRE-609, FRE-596, FRE-575
  • todo: FRE-587, FRE-588, FRE-589, FRE-585 child issues

Velocity: 6/13 MVP subtasks complete (46%). Technical direction set, Founding Engineer executing.

Next Action: Founding Engineer continues with remaining infrastructure (FRE-606 Tauri, FRE-607 Clerk, FRE-609 tRPC) and MVP features.

Evening Update (Foundation Complete)

Completed:

  1. Confirmed foundation tasks complete:
  2. Unblocked FRE-587 Real-time collaboration (now in_progress)
  3. Marked FRE-574 as done

MVP Progress: 7/13 subtasks complete (54%)

Pipeline:

  • done (7): FRE-574, FRE-586, FRE-590, FRE-592, FRE-594, FRE-607, FRE-608, FRE-609
  • in_progress: FRE-587 (Founding Engineer - real-time collaboration)
  • todo: Remaining MVP features

Next: Founding Engineer building real-time collaboration layer (FRE-587) on top of completed foundation.