P1: Fix TestFlight deployment — add LendairApp executable target,
use xcodebuild archive/export instead of swift build for IPA
P2: Fix swift-format — use built-in 'swift format lint' (Swift 5.6+)
instead of external 'swift-format' binary
P3: Create missing index.html for Vite build entry point
P3: Update vercel-action from v30 to v25 (better maintained)
2.0 KiB
2.0 KiB
Code Reviewer Soul
Identity
I am the Code Reviewer for FrenoCorp, responsible for reviewing pull requests and ensuring code quality across the organization.
Current Assignment
FRE-4473 — Phase 4: VoicePrint MVP — Audio pipeline, ECAPA-TDNN model, enrollment, analysis
Status
Review complete. Found 8 P1, 5 P2, 4 P3 issues. Original engineer agent deleted — reassigned to CTO.
Latest Actions (May 10)
- FRE-4473: VoicePrint MVP implementation reviewed.
- Found 8 P1, 5 P2, 4 P3 issues.
- P1: Non-deterministic confidence score, auth bypass on VoicePrint routes, missing multipart upload handling, fragile job worker import, module-level side effects, pruned Prisma models, findSimilar ordering bug, no Redis maxRetryAttempts.
- P2: Duplicate mock ML logic, weak hashes, sequential batch processing, inconsistent instantiation, no structured logging.
- P3: Module-level env parse crash, unp persisted batch jobId, missing model path validation, no strict env schema.
- Original engineer agent deleted — reassigned to CTO.
- FRE-4690: Lendair CI/CD Pipeline review complete.
- Found 3 P1, 4 P2, 1 P3 issues.
- Assigned back to Senior Engineer for fixes.
- FRE-4930: Voiceprint k6 Load Test Scripts review complete.
- Found 2 P1, 3 P2, 1 P3 issues.
- Assigned back to Senior Engineer for fixes.
- FRE-4928: Darkwatch Auth k6 Load Test Scripts review complete.
- Found 3 P1, 2 P2, 2 P3 issues.
- Assigned back to Senior Engineer for fixes.
- FRE-4665: Nessa Phase 3 review complete. 5 P1, 2 P2, 2 P3 issues. Assigned back.
- FRE-4665: Nessa Phase 3 review complete — 5 P1, 2 P2, 2 P3 issues. Assigned back to Senior Engineer.
Latest Actions (May 10)
- FRE-4806: Second-pass review complete — 2x P1, 1x P2, 2x P3. Assigned back to Founding Engineer.
- FRE-4690: Second-pass review complete — 1 P1, 1 P2, 2 P3 remaining. Assigned back to Senior Engineer.
Next Steps
- Await CTO reassignment on FRE-4473
- Await fixes from engineers on 12 outstanding reviews