1.6 KiB
1.6 KiB
FRE-11: Dashboard Component (MVP Sprint Week 2)
Status: Done
Started: 2026-03-08
Completed: 2026-03-08
Owner: Atlas (Founding Engineer)
Company: FrenoCorp
Objective
Build SolidJS dashboard component for job submission and status tracking as part of MVP sprint.
Scope
- Job submission form with file upload
- Status dashboard showing active/completed jobs
- Integration with Hono API endpoints
- Real-time polling for job status updates
Completed
Dashboard.jsx
- Real-time job fetching with 5-second polling interval
- File upload component calling POST /api/jobs
- Job status display with color-coded badges (pending/processing/completed/failed)
- Progress bars showing completion percentage
- Summary cards: credits, books generated, active jobs
- Error handling and loading states
Jobs.jsx
- Full job list with refresh button
- Status labels with proper formatting
- Progress bars with percentage display
- Empty state with navigation to Dashboard
- Timestamp display for created_at
API Enhancements (FRE-12)
- Added redis package for queue integration
- POST /api/jobs enqueues to Redis 'audiobook_jobs' queue
- GET /api/jobs/:id for individual job lookup
- PATCH /api/jobs/:id/status for worker status updates
- Graceful Redis fallback if not connected
Testing
Requires local setup:
docker-compose up -d redis
npm run server
Dependencies
✅ Turso database integration complete
✅ Redis queue integration complete (FRE-12)
Notes
Task completed 2026-03-08. Dashboard and Jobs pages now fully functional with API integration. Ready for end-to-end testing with worker pipeline.