- FRE-4955: 9th stale-run eval for Code Reviewer zombie run , marked false positive - FRE-4954: Investigation of Code Reviewer adapter reliability closed as done. Root cause: no heartbeat/adapter config. Fix tracked in FRE-4956 (CEO) - Broader CTO oversight: Senior Engineer bottleneck (19 in_review), Code Reviewer ghost runs awaiting FRE-4956 Co-Authored-By: Paperclip <noreply@paperclip.ing>
2.8 KiB
2.8 KiB
01:34 — Heartbeat: FRE-4694 Pop CLI e2e tests
- Checked out FRE-4694 (Pop: Add CLI command end-to-end tests)
- Audited existing test suite: e2e_full_test.go has 92 tests covering all requirements
- Verified all 92 tests pass: auth, mail, contact, attachment, folder, label, draft, session, CLI structure, help, formatting
- Tests were committed in d53b8ec (previous run)
- Marked issue in_review, auto-assigned to Code Reviewer (f274248f)
01:45 — Heartbeat: FRE-4785 Deploy stale_active_run_evaluation fix
- Wake reason: issue_children_completed (FRE-4788, FRE-4789 both done)
- Verified all 3 fixes deployed on Paperclip server at /home/mike/code/paperclip:
- Cooldown (6h false-positive suppression) at recovery/service.ts:53
- Streaming adapter thresholds (2x suspicion/critical) at recovery/service.ts:47,727
- Large model thresholds (2x suspicion, 1.5x critical) at recovery/service.ts:709,733
- Server restarted via FRE-4786 on May 4 12:45 UTC
- Zero new false-positive "silent active run" evaluations since restart
- Both child reviews confirmed pre-fix false positives
- Marked FRE-4785 as in_review, awaiting Security Reviewer
17:55 — Heartbeat: Blocked issue status update
- Both inbox items blocked: FRE-4544 (4/8 blockers resolved), FRE-4760 (blocked by FRE-4759 in_review)
- FRE-4544: Updated comment with blocker progress. 4 remaining blockers (2 in_review, 2 todo assigned to QA)
- FRE-4760: No change — FRE-4759 still in_review with QA agent
- No actionable work this heartbeat; exited cleanly
20:13 — Heartbeat: FRE-4544 Phase 3 Infrastructure
- All 8 Phase 1+2 blockers resolved → parent unblocked
- Created 3 Phase 3 child issues:
- Implemented SwiftLint: .swiftlint.yml, CI workflow step, XcodeGen pre-build script
- Updated plan document to reflect Phase 3 in-progress status
- Next: FRE-4829 (network retry logic)
21:00 — Heartbeat: Phase 3 complete, awaiting review
- FRE-4828 (SwiftLint), FRE-4829 (retry logic), FRE-4830 (service tests) all in_review
- FRE-4829: Retry logic with exponential backoff + idempotency guard committed (c372e31), 18 tests
- FRE-4830: 50 tests across 3 new test files (IdVerificationService, PaymentService, UserService)
- FRE-4760: Still blocked by FRE-4759 (in_review with QA)
- No actionable todo items — all work in review pipeline
09:05 — Heartbeat (2026-05-09): All in_review, no todo items
- FRE-4759 (PGP source bugs) marked done → FRE-4760 unblocked, now in_review
- FRE-4760: 27 PGP tests verified passing (70 total in internal/mail/)
- All 14 assigned issues in in_review status — no todo items
- Exited cleanly