marketing: FRE-199 first pair of informational pages + pitch shape (drafts)
- agent-done-signal: 'How do you know when your coding agent is done?' — the zero-looks-like-success cluster (1xjb3j0, 1xm09fs, 1xmnz2c, HN fhub/ sadilek); Stop/Notification/StopFailure hooks cited to the agent's own docs, re-read 2026-11-05. No product, no competitor, no price. - agent-waiting-on-permission: 'Why is my coding agent sitting on a permission prompt?' — the 1xhbc71 thread + invisible-permission cluster; permission modes, /permissions, rule syntax, acceptEdits cited to the permissions doc; undo-split attributed to 1xkoz06. - newsletter-postmortem-pitch: item 2's shape, placeholders only; send gated on FRE-202 or a CTO-confirmed direct relay-store read. All drafts: sponsor fact-check moves pending/ -> approved/; nothing publishes itself.
This commit is contained in:
82
marketing/drafts/newsletter-postmortem-pitch/copy.md
Normal file
82
marketing/drafts/newsletter-postmortem-pitch/copy.md
Normal file
@@ -0,0 +1,82 @@
|
||||
# Newsletter pitch — post-mortem shape (placeholders; numbers gated)
|
||||
|
||||
> **Status: draft — placeholders only. No figure in this file is a measurement.**
|
||||
> FRE-199 item 2. Drafted 2026-11-05 by CMO; the plan's date was Fri 2026-11-06.
|
||||
> **Send gate:** no figure ships until FRE-202 (weekly metrics job) or a direct
|
||||
> read of the relay store provides it **and** the CTO confirms the query. Paid
|
||||
> placements stay out (TLDR ≈ $3k/placement, no verifiable CPC to buy against).
|
||||
|
||||
## Audience & channel
|
||||
|
||||
Editors of free dev-tool newsletters (the ones that run post-mortems and
|
||||
"what we learned" pieces). Direct email, one editor at a time, personalised.
|
||||
No paid placements at any budget without a CoS + sponsor decision.
|
||||
|
||||
## The claim the pitch goes out with
|
||||
|
||||
A post-mortem pitch, not a product pitch: *here is what shipping a Mac utility
|
||||
alone actually broke, and what we changed because of it.* The product is the
|
||||
setting; the breakage and the fix are the story.
|
||||
|
||||
## The pitch (shape — every figure is a placeholder)
|
||||
|
||||
**Subject:** What shipping a Mac utility alone broke (post-mortem)
|
||||
|
||||
Hi <editor>,
|
||||
|
||||
We build The Nook, a $10 Mac utility that surfaces coding-agent approvals at
|
||||
the notch. I'm not pitching the app — I'm offering a post-mortem your readers
|
||||
usually only get from funded startups, because shipping alone broke things in
|
||||
ways bigger teams don't hit:
|
||||
|
||||
- **The silent update.** In October we shipped a release whose appcast published
|
||||
cleanly — while every delta it named 404'd, so users on older builds were
|
||||
being offered updates that didn't exist. The publish path deleted files
|
||||
before the feed that named them was live. Nothing alerted; the feed just
|
||||
lied quietly. (Documented in our own changelog discipline: the fix — upload
|
||||
the feed's enclosures, verify every URL, *then* prune — is now ordered so
|
||||
the deletion can't run first.)
|
||||
- **[PLACEHOLDER — second breakage: the launch-incident story with a real
|
||||
number attached. Candidates from the engineering journal: the 0.13.x
|
||||
appcast-item loss (changelog blanking on prune), or the relay regression
|
||||
that shipped behind a passing suite. Pick the one FRE-202's data can
|
||||
quantify.]**
|
||||
- **The numbers, as they are.** <N> activations and <X>% trial→paid as of
|
||||
<date> — small numbers, real ones, and the interesting part is the funnel
|
||||
shape, not the size.
|
||||
|
||||
The angle for your readers: solo distribution is a chain of quiet failure
|
||||
modes, each one invisible until it costs a user. We kept the receipts.
|
||||
|
||||
Happy to send the full write-up, screenshots of the broken feed, and the
|
||||
exact publish-order change.
|
||||
|
||||
— <name>, FrenoCorp
|
||||
|
||||
## Where the numbers come from (and the caveats that travel with them)
|
||||
|
||||
- **Preferred source:** FRE-202, the weekly metrics job (CTO owns the query).
|
||||
- **Fallback:** a direct read of the relay store — `installs` (one row per
|
||||
activated install, `created_at`) for activations; `admissions`
|
||||
(`license_id` non-empty = licensed, empty = trial) for the trial→paid split.
|
||||
- **Caveats that go in the pitch, not a footnote:**
|
||||
- a conversion figure is per *install* (install cap is 3), not per person;
|
||||
- DMG downloads (S3 side) and activations (relay store) are two different
|
||||
numbers — the pitch says which one it quotes;
|
||||
- "1,900 downloads, 6% trial→paid" is the *shape* of a pitch, never a figure
|
||||
we hold. No number is estimated to fill a placeholder.
|
||||
|
||||
## Gates before anything is sent
|
||||
|
||||
1. Figures exist (FRE-202 or CTO-confirmed direct read) — owner: CTO.
|
||||
2. CTO confirms the query behind every figure quoted — owner: CTO.
|
||||
3. Sponsor approves the send and holds the sending account (humans hold every
|
||||
account) — owner: Michael Freno.
|
||||
4. The second breakage paragraph is fact-checked against the engineering
|
||||
journal before send — owner: CMO, evidence to CTO for verdict.
|
||||
|
||||
## Target dates (internal)
|
||||
|
||||
- Draft with placeholders: **done 2026-11-05** (plan date was 2026-11-06).
|
||||
- Figures dropped in: when FRE-202 or the direct read exists — no date promised.
|
||||
- Send: only after gates 1–4. Sponsor submits.
|
||||
Reference in New Issue
Block a user