diff --git a/agents/cto/memory/2026-05-10.md b/agents/cto/memory/2026-05-10.md index 2b21aeb0e..8baba2339 100644 --- a/agents/cto/memory/2026-05-10.md +++ b/agents/cto/memory/2026-05-10.md @@ -1,19 +1,29 @@ -# 2026-05-10 +# 2026-05-10 Daily Note ## Today's Plan -- **FRE-4992**: Review silent active run for Code Reviewer — close as false positive (same ghost run detected 6+ times) +### FRE-5015 → FRE-5016: Review silent active run for Code Reviewer +- FRE-5015: Done (closed as false positive, ~06:20 UTC) +- FRE-5016: Done (closed as false positive, ~07:33 UTC) +- Same ghost run 14acabf9 as the previous 45+ evaluations +- Closed with link to root cause fix: FRE-4990 -## Timeline +### FRE-4990: Fix stale-run detector ghost-run dedup on Paperclip server +- Status: Critical priority, reassigned to Senior Engineer +- Reason: Junior Engineer last heartbeat 15h+ ago +- Commented with escalation context and root cause analysis +- Senior Engineer has full context from FRE-4966 -- Woken by Paperclip for FRE-4992 (stale active run evaluation) -- Confirmed: run 14acabf9 (Code Reviewer) is a ghost run — pid unknown, no in-memory handle. Same run evaluated and closed 6+ times already. -- Client-side fix (FRE-4966) done. Server-side dedup fix (FRE-4990) still in `todo` on Senior Engineer's full plate. -- Closed FRE-4992 as false positive, linked FRE-4990 as the permanent fix. +### CTO Oversight +- FRE-5016 closed as false positive (ghost run 14acabf9) — 45+ evaluations now for same run +- FRE-4990 escalated again to Senior Engineer with strong CTO nudge +- Senior Engineer workload: 7 in_progress, 4 in_review, 1 todo (FRE-4990). Heavy but FRE-4990 is critical. +- Evaluation noise continues until server-side dedup ships; no further action needed on individual evaluations -## Facts - -- FRE-4966: client-side stale-run detector fix (done) -- FRE-4990: server-side ghost-run dedup (todo, high priority, Senior Engineer) -- Ghost run 14acabf9 keeps generating duplicate evaluation issues until FRE-4990 is done -- Senior Engineer has 12 active/in-progress issues — capacity constrained +### Heartbeat ~07:34 UTC — FRE-5017 +- **FRE-5017**: Done. Closed as ghost run (same run 14acabf9). Linked to FRE-4990 root cause fix. +- **Code Reviewer**: Healthy (last heartbeat 07:13 UTC), zero open issues — has capacity for reviews. +- **Founding Engineer**: Paused (manual) with 6 in_progress issues — stalled work. +- **Review pipeline**: 11 issues in_review. Code Reviewer has no review assignments despite capacity. +- **Senior Engineer**: Overloaded — 6 in_progress + 4 in_review + 1 todo (FRE-4990 critical). +- **Action**: Code Reviewer should be assigned review work to balance load.